1.给料机在使用过程中需要检查如下内容
(1)检查给料机和激振器振幅,振幅不得超过给料机设计极限值。
(2)检查主振橡胶弹簧是否有开裂。
(3)检查隔振弹簧是否有开裂。
(4)检查各紧固螺栓是否有松动。
(5)检查电动机运转中是否有异常声响。
2.给料机运行初期一周内,必须每天检查并拧紧各连接螺栓,一周后,可隔一天检查并拧紧一次,直到设备运行稳定为止。
3.电机维修与保养按电机使用说明书进行。
4.振动给料机操作规程
(1)给料机安装与振动电机接线后,进行全面安全检查,以避免开机后发生人身与设备事故,确认各处螺栓紧固,设备可靠接地,方可开机。
(2)给料机不宜空载运转时间过长,30分钟以内停机后,要将全部螺栓紧固一次,以后要定期检查,发现松动及时紧固,确保振动电机与设备的牢固连接。
(3)在调整给料量时,可以通过以下方法进行。
补.调整加大振动电机的激振力。
产.调整槽体吊挂的长度,使槽体沿下料方向往下倾斜,倾斜角度在通常情况下0词-140范围内,按不同物料的自然安息角,以不自动跑料为原则。
英文如下:
1 feeder in use process must always check the following
(1) examined the feeder and the vibration amplitude, amplitude limit value shall not exceed the feeder design.
(2) check the main vibration rubber spring if there is crack.
(3) check the isolation spring if there is crack.
(4) check the fastening bolts are loose.
(5) to check whether there is abnormal sound of motor in operation.
2 feeder in early operation period of a week, must be inspected daily and tighten all the connecting bolts, a week later, can be every day to check and tighten again, until the stable operation of equipment.
3 Motor repair and maintenance according to the motor with the instruction manual.
4 double mass vibration feeder operation procedures
(1) feeder mounted and vibration motor wiring, type XZG to conduct a comprehensive safety inspection, to avoid the boot after the personal and equipment accident, confirmed all bolts, reliable equipment grounding, can boot.
(2) feeder for no-load running time is too long, 30 minutes after shutdown, will all bolt a, later to be checked regularly, ensure timely found loose fastening, the vibrating motor and equipment connected.
(3) in the adjustment of feeding amount, can adopt the following methods.
a adjusted to increase the exciting force of the vibrating motor.
b Adjustment tank hanging length, the trough along the feeding direction slope down, tilted at the angle of typically 0 - 140 range, according to the different material natural angle of repose, to automatically run the material principle.